Geppetto MFG

Managed High-Mix CNC Manufacturing for Robotics Programs.

We align DFM, tolerance control, and delivery risk before release so robotics and industrial teams can source precision parts with fewer surprises.

Lead Time 72 HRS
Precision 0.01 MM
MOQ 1 UNIT

Program Solutions

Value-led solutions with managed guarantees and proof.

UNIT-01 Rapid Prototyping

Fast iteration without losing control.

Value Shorter iteration cycles with confident decisions.
Risk Removed Hidden manufacturability risk that forces late resets.
Managed Guarantee DFM pass and routing lock before the first cut.
Proof DFM response log with revision map.
Result Fewer resets with a faster path to design freeze.
Open Program
UNIT-02 Low-Volume Production

Bridge builds that stay stable before scale.

Value Bridge output stays consistent before scale-up.
Risk Removed Batch variance and rework that erode trust.
Managed Guarantee Process control and sampling cadence locked before release.
Proof Process control summary and sampling plan.
Result Stable output with predictable quality gates.
Open Program
UNIT-03 Production Ramp

Scale output without losing delivery cadence.

Value Ramp volume without losing delivery cadence.
Risk Removed Capacity drift and yield loss during scale-up.
Managed Guarantee Capacity alignment, routing lock, and SPC control.
Proof Capacity allocation record, SPC snapshot, and delivery lane log.
Result Predictable throughput with on-time milestones.
Open Program
UNIT-04 Complex Precision Parts

Critical features held inside tight tolerance bands.

Value Critical fits hold without late surprises.
Risk Removed Thermal drift and stack-up causing assembly failure.
Managed Guarantee Critical features tiered and metrology locked.
Proof Inspection scope, CMM plan, and deviation record.
Result Assembly-ready precision with traceable proof.
Open Program
UNIT-05 Cost and Lead-Time Optimization

Tradeoffs modeled before commitment.

Value Cost and lead-time tradeoffs decided early.
Risk Removed Over-spec and late re-quotes that inflate cost.
Managed Guarantee Cost model and routing comparison before release.
Proof Cost curve notes, routing comparison, and risk envelope.
Result Lower cost and shorter lead time without unmanaged risk.
Open Program

Managed Program Console

Outcome-first checkpoints mapped to control and proof.

PROCESS CONSOLE

Outcome

Outcome First

We commit to deliverable outcomes before you commit budget.

02

Program

Program Solutions

Solutions map to your decision path, not our equipment list.

03

Delivery

Landed Delivery Control

Delivery is part of the plan, not an add-on.

04

Evidence

Evidence System

Standard evidence is native to every program; advanced metrology proof is available on request.

EVIDENCE BAND

Evidence System

Proof artifacts attached to each managed checkpoint.

EVD-01 Standard

Feasibility Review

Risk flags and manufacturability notes.

  • Risk flags
  • DFM notes
  • Scope alignment
EVD-02 Standard

Quality Plan

Inspection scope and sampling cadence.

  • Critical dims list
  • Sampling cadence
  • Method assignment
EVD-03 Standard

Delivery Proof

Milestone log with POD confirmation.

  • Milestone log
  • POD confirmation
  • Compliance notes

Standard Flow

The Geppetto Guarantee

Submit
01
RFQ Intake Design package captured
GUARANTEE Intake Audit Requirements confirmed
RFQ logDesign package checklist
02
Feasibility + DFM Risks flagged
GUARANTEE DFM Audit Risks triaged
Feasibility review
Quote
03
Quote & Scope Confirmation Program aligned
GUARANTEE Process Audit Process confirmed
Process control
Production
04
Production Start Program verified
05
In-Process QC Deviation tracked
GUARANTEE In-Process Audit Deviation logged
In-process inspection record
Delivery
06
Delivery Proof POD confirmed
GUARANTEE Delivery Proof POD logged
POD confirmation

Validation Path

01

STEP 01

Design intake + DFM audit

We capture design intent, risk tags, and feasibility assumptions.

02

STEP 02

Controlled sample build

First articles produced with locked routing and inspection scope.

03

STEP 03

Proof package issued

Evidence artifacts align to risk and delivery commitments.

04

STEP 04

Risk alignment decision

We proceed only after control and validation scope are agreed.

Outcome Snapshots

Illustrative results tied to managed checkpoints.

Robotics

Tolerance tier reset

Critical features held while non-critical dims relaxed for cost stability.

Cost -12%
Lead Time -8 days

Industrial

Process control lock

Routing and inspection scope locked before release to prevent rework.

Rework -20%
Yield +9%

Medical

Delivery proof alignment

POD and compliance evidence issued at handoff.

On-Time +6%
Escalations -18%

Submit for Process Control Review